Skip to product information
1 of 5

LABINVO

4pcs of Sodium Hypochloride Wash Bottles, Vol.500ml (17oz), Narrow Mouth, Self-Venting Safety Wash Bottles, LDPE Material, IN-WBS500

4pcs of Sodium Hypochloride Wash Bottles, Vol.500ml (17oz), Narrow Mouth, Self-Venting Safety Wash Bottles, LDPE Material, IN-WBS500

Regular price $46.49 USD
Regular price $46.49 USD Sale price
Shipping calculated at checkout.

Overview

  • Brand : LABINVO
  • Material : Low Density Polyethylene
  • Color : Sodium Hypochloride Wash Bottles
  • Capacity : 500 Milliliters
  • Product Dimensions : 1.97"W x 4.6"H

About this item

  • Capacity: 4pcs of 500ml (17oz)
  • O.D×Height: 2.91’’×7.2’’(74mm×183mm), the diameter of mouth is 1.36’’ (34.5mm)
  • Material: Bottle is made of LDPE(Low Density Polyethylene) material which has good flexibility, elasticity, and impact resistance, draw tube is made of PP(Polypropylene).
  • Superiority: High sealing performance, effectively prevent the volatilization of liquid
  • Appearance: The wash bottle has a label with chemical name, the chemical formula of the International Chemical Society (ICS) and the Chemical Abstract Service (CAS) number, cap in red color.
View full details
  • ⭐⭐⭐⭐⭐

    “Great products, great mission, and I feel proud supporting them.”

    -Sophie H.

  • ⭐⭐⭐⭐⭐

    “EcoBuddy helped me take my first step into zero waste living without feeling overwhelmed.”

    Marco V.

  • ⭐⭐⭐⭐⭐

    “EcoBuddy makes sustainable living so easy. The products are beautiful and feel high quality.”

    Clara M.